Project Summary
The Paradise Creek Water Quality and Community Enhancement project Ph. II, CIP 19-11 is the second implementation phase that will provide immediate benefit to the creek and the community. Phase II of the project consists of repairing sections of Paradise Creek at Plaza Blvd, including removal of existing concrete lining on south creek bank, earthwork and regrading, and installing articulated concrete blocks and cutoff wall on south creek bank. Drainage improvements include adding bar screen gates at the outlet and inlet of existing reinforced concrete box storm drains, and rip rap.
Other site improvements include retaining wall, concrete driveways, decomposed granite (DG) access road and perimeter wrought iron fencing, replacing ADA curb ramps, and access gates to secure the area.
Timeline
See the project timeline below for Paradise Creek Water Quality & Community Enhancements Phase 2.
Funding
See the funding sources below for Paradise Creek Water Quality & Community Enhancements Phase 2.
Project Updates
DATE:
September 20, 2024
UPDATE:
The Contractor has completed installation of the precast box culvert on the downstream portion of the creek to include surface repairs and asphalt placement. They have transitioned traffic controls to the upstream portion of the project site to complete the installation of the box culvert and begin installation of the culvert headwalls.
Project Team
General Contractor:
Wright Construction Engineering Corp
2625 S Santa Fe Ave
San Marcos, CA 92069
760.599.3915
Project Manager:
Project Professionals Corporation
Josh Johnson, PE
4700 Spring Street, Suite 100
La Mesa, CA 91942
858.634.8180
Administrator:
City of National City
Steve Manganiello, TE
1243 National City Blvd
National City, CA 91950
619.336.4380