Project Summary
The project provided a 2” grind and overlay on 0.5 miles of Sweetwater Road from Stockman Street to the east side of Via Romaya Street within the existing right-of way, and upgrade ADA ramps to the current standard within the project limits, as well as address damaged cross gutter, and curb and gutter. The project also installed new street lighting, raised median for traffic calming, new striping including crosswalk and class II bike lane along Sweetwater Road.
Completed in 2021